An Asbestos Register That's Actually Maintained.
The duty to manage sits with you. We hold the register, schedule the re-inspections and keep the evidence in shape for the HSE.
Survey, register, remedial.

Survey → register → re-inspect → remove.
The duty to manage is continuous. The register can't be a 2011 spreadsheet someone last touched in 2014.
Asbestos register
Survey results imported per site, materials catalogued with location, condition score, and presumed-vs-confirmed flag.
Re-inspection schedule
Material-condition driven. Friable materials reviewed more frequently; minor items on a long cycle. Schedule per-material, not per-site.
Licensed-contractor verification
Removal contractors must hold an HSE licence. We verify at upload and refuse the work order if the licence has lapsed.
Refurbishment / demolition surveys
R&D survey type tracked separately from the management survey. Pre-works check enforced before any intrusive work goes ahead.
Notification logging
Notifiable Non-Licensed Work (NNLW) and licensed-work notifications tracked with the relevant HSE submission references.
Damage / disturbance flags
Any reported damage to an ACM auto-creates a stop-the-line work order; the area is sealed until the report comes back clean.
Other Statutory Regimes.
The Duty to Manage is Continuous. the Register Should Be Too.
14-day Pro trial. No card. Compliance tier from £199/mo. Light users (contractors, tenants) free at every tier.