CP12, with a Gas Safe engineer.
The regulations don't recognise 'the boiler man'. They recognise a Gas Safe engineer with the right appliance categories. Verified at upload, surfaced before expiry.
Engineer, appliance, outcome.

Twelve-month maximum, and a faster lane for AR/ID.
A satisfactory CP12 buys twelve months. An At-Risk outcome buys days. Two separate clocks, one obligation row.
- T − 90 daysFirst flag
In-app + email to the estates lead and the Gas Safe contractor pool surfaces in the next-booking shortlist.
- T − 30 daysAuto work order
Work order raised, routed to the prior engineer if their registration is current, otherwise to the smart-matched pool.
- T − 7 daysDaily reminder
Reminders escalate daily until the new CP12 lands. Hit T = 0 with no cert and the status pill flips to Overdue.
- AR / ID outcomeStop-the-line
Independent of the annual clock. The appliance is isolated and a stop-the-line WO opens within seconds of the engineer's upload.
Every appliance, every flue, every engineer.
Annual CP12
12-month default cycle, per-appliance status tracked. New install reset to 12 months from commissioning.
Gas Safe verification
Engineer's Gas Safe number verified at upload time. Appliance category checked against the appliance being certified.
At-risk / immediately-dangerous flags
AR / ID outcomes auto-create stop-the-line work orders; the appliance is marked isolated until evidence of repair is uploaded.
Multi-occupancy + non-domestic
Both CP12 (landlord) and the broader non-domestic gas safety regime supported, including the relevant exemptions and frequencies.
Service vs certification
Annual service and annual certification tracked as separate events. The manufacturer's service schedule and the legal certification cycle rarely align.
Pre-expiry workflow
90 / 60 / 30 / 7-day warnings, auto-created work order, Gas Safe-only contractor pool surfaced when you book.
Further Reading.
Other Statutory Regimes.
An Expired CP12 is the Easiest Avoidable Headline.
14-day Pro trial. No card. Compliance tier from £199/mo. Light users (contractors, tenants) free at every tier.